Crew Procedure Training — Pre-Launch Checklist
MISSION FOXTROT-SIX · LIVE
STEP 06 / 20 — WEEK 2

Crew
Procedure
Training

승무원 절차 훈련

NASA 규칙 1번 — 체크리스트 없이는 아무것도 시작하지 않는다. 발사 전 4단계 체크리스트를 완주하세요. 문제가 생기면 즉시 멈추고 Mission Control에 보고합니다.

▸ 오늘의 핵심 표현 4가지
01
"Step [N]: [action] — Done! Next step!"
[N]단계: [행동] — 완료! 다음 단계!
02
"Step [N] has a problem. Stopping now."
[N]단계에 문제가 있습니다. 지금 멈춥니다.
03
"Mission Control! Step [N] has a problem!"
관제센터! [N]단계에 문제가 발생했습니다!
04
"Checklist complete. All steps done. Ready!"
체크리스트 완료. 모든 단계 완료. 준비됐습니다!
▸ 발사 전 체크리스트 4단계
STEP 3 — PROBLEM DETECTED
1
EQUIPMENT CHECK
장비 점검
✅ COMPLETE
2
SYSTEMS CHECK
시스템 점검
✅ COMPLETE
3
CREW CHECK
승무원 점검
⚠️ PROBLEM
4
LAUNCH READINESS
발사 준비
⏸️ ON HOLD
▸ 수업 구조
45 MIN · WEEK 2
5'
MISSION BRIEF
Week 1 복습 + Week 2 소개 + Mission Code FOXTROT-SIX
10'
WORD TRAINING
체크리스트 어휘 + 완료 보고 패턴 + 문제 보고 패턴
25'
MISSION TIME
영상 시청 → 체크리스트 릴레이 → Camp A GPT 문제 시나리오
5'
DEBRIEF
4단계 확인 + 평가 + STEP 7 예고
▸ 학년별 커리큘럼
01
checklist
점검 목록
"Follow the checklist!"
02
step
단계
"Step 1 is done!"
03
done
완료
"This step is done!"
04
problem
문제
"We have a problem!"
1
체크리스트 따라하기
⏱ 8분
교사가 4단계를 보여주면 학생들이 따라 말합니다. "Step 1: Equipment check. Done! Next step!"
2
팀 릴레이
⏱ 9분
팀원이 번갈아 각 단계를 보고합니다. 교사가 "Problem!" 카드를 삽입하면 "We have a problem!" 외치기.
3
Camp A GPT 체크리스트
⏱ 8분
Camp A GPT와 함께 4단계 체크리스트를 영어로 완주합니다.
01
checklist
점검 목록
"Follow the checklist. No shortcuts!"
02
proceed
진행하다
"Step 2 complete. Proceeding to Step 3."
03
halt
멈추다
"Halting checklist. Problem detected."
04
resume
재개하다
"Problem solved. Resuming checklist."
05
authorize
허가하다
"Requesting authorization to proceed."
1
STEP 6 영상 시청
⏱ 5분
체크리스트 진행 장면과 문제 발생 대응 장면을 보며 핵심 표현을 확인합니다.
2
체크리스트 릴레이 + 문제 삽입
⏱ 10분
팀원이 번갈아 4단계 보고. 교사가 무작위로 "Problem!" 카드 삽입 → 즉각 보고 + 팀 해결.
3
Camp A GPT 문제 시나리오
⏱ 10분
Camp A GPT와 체크리스트 진행 중 문제 발생 → 보고 → 해결 → 재개 전체 시퀀스 연습.
01
procedural compliance
절차 준수
"Procedural compliance is mandatory."
02
deviation
이탈, 절차 위반
"A procedural deviation has occurred."
03
corrective action
교정 조치
"Initiating corrective action. Over."
04
authorization
공식 허가
"Requesting Mission Control authorization."
05
anomaly log
이상 기록
"Anomaly logged for post-mission review."
06
contingency
비상 계획
"Executing contingency procedure B."
1
Checklist + 의도적 편차
⏱ 8분
4단계 체크리스트 수행 중 편차 3회 삽입. 패턴 2로 즉각 보고 + 교정 조치 요청.
2
절차 이탈 토론
⏱ 8분
"Should astronauts ever skip a checklist step in an emergency?" 영어로 논거 제시.
3
Camp A GPT 심화 교신
⏱ 9분
복합 체크리스트 편차 + Mission Control 공식 보고 + 이상 기록 + 재개 승인 요청.
▸ CEC Camp A GPT 교신 훈련
MISSION TIME 25MIN
📋
체크리스트 절차 교신 훈련
Camp A GPT가 Mission Control 역할로 체크리스트 절차를 진행합니다.
정상 완주 또는 문제 발생 시나리오를 선택해 훈련하세요!
▸ 훈련 방법
01이름·팀을 입력하세요
02시나리오 선택 (정상/문제/랜덤)
03프롬프트 복사하기
04Camp A GPT 열기 → 붙여넣기 → 시작!
▸ GRADE LEVEL
▸ CAMP A GPT 프롬프트 미리보기
정보를 입력하면 프롬프트가 여기에 표시됩니다...
🚀 CEC Camp A GPT 열기
✅ 복사 완료! Camp A GPT에 붙여넣으세요.
▸ 평가 기준
PASS
4단계 체크리스트 패턴 A 완주
⭐⭐
GOOD
패턴 A+B + 문제 보고 + Camp A GPT 교신
⭐⭐⭐
EXCELLENT
패턴 전부 + 문제 해결 + 재개 + 완료 보고
▸ 오늘의 복습 과제
🇺🇸
미국 원어민 5학년
⏱ 약 1~1.5시간
  • 단어 5개 암기 + 예문 (20분)
  • 체크리스트 4단계 패턴 A 외우기 (25분)
  • 문제 시나리오 2개 패턴 B+C 작성 (20분)
  • 내일: 탑승·안전벨트 훈련 예습 (10분)
🇰🇷
한국 5학년
⏱ 약 2~2.5시간
  • 단어 5개 완전 암기 (25분)
  • 패턴 A+B+C 외우기 + 응용 (45분)
  • Camp A GPT 랜덤 시나리오 교신 (30분)
  • Apollo 13 체크리스트 관련 조사 (20분)
← PREV NEXT →
▸ READING SECTION
집에서 혼자 연습
▸ 주제 질문 TOPIC QUESTION
Why do astronauts use a checklist before every mission?
우주비행사는 왜 모든 미션 전에 체크리스트를 사용할까요?
📖 Reading Passage — Grade 4

Today is Step 6.

The trainees learn about checklists.
A checklist is a list of things to do.
Astronauts use checklists before every mission.

The checklist has four steps.
Step 1: Equipment Check.
Step 2: Systems Check.
Step 3: Crew Check.
Step 4: Launch Readiness.

Robo says, "Never skip a step!"

When Step 3 has a problem, they stop.
They report to Mission Control: "Mission Control! Step 3 has a problem!"

After the problem is fixed, they continue.
Checklist complete! Now they are ready for launch.

오늘은 6단계입니다.

훈련생들은 체크리스트에 대해 배웁니다.
체크리스트는 해야 할 일들의 목록입니다.

체크리스트에는 4단계가 있습니다.
1단계: 장비 점검. 2단계: 시스템 점검.
3단계: 승무원 점검. 4단계: 발사 준비.

로보가 말합니다. "절대 단계를 건너뛰지 마세요!"

3단계에서 문제가 생기면 멈추고 관제센터에 보고합니다.
"관제센터! 3단계에 문제가 생겼습니다!"

체크리스트 완료! 이제 발사 준비가 됐습니다.

📝 Key Words
checklist
체크리스트
equipment
장비
systems
시스템
crew
승무원 팀
launch
발사
readiness
준비 상태
skip
건너뛰다
report
보고하다
❓ Check Questions
  1. What is a checklist?
  2. How many steps does the pre-launch checklist have?
  3. What happens when Step 3 has a problem?
  4. What do trainees say to Mission Control?
🗣️ Speak & Write
Step 1: Equipment check — done!
Step 2: Systems check — done!
Mission Control! Step 3 has a problem!
Checklist complete. Ready for launch!
📖 Reading Passage — Grade 5

In Step 6, trainees learn about crew procedures and checklists.

NASA has a very important rule: never begin a mission without completing the checklist.

Step 1 is Equipment Check — all tools, suits, and gear must be in the correct place.
Step 2 is Systems Check — all systems must report "nominal" (normal and working correctly).
Step 3 is Crew Check — each crew member confirms they are ready.
Step 4 is Launch Readiness — the whole crew confirms all steps are complete.

During training, Step 3 shows a problem: "PROBLEM DETECTED!"

The crew must stop immediately, report to Mission Control, fix the problem, and then resume the checklist from Step 3.

This drill teaches trainees: a checklist is not just a routine. It is a safety system.

6단계에서 훈련생들은 승무원 절차와 체크리스트에 대해 배웁니다.

NASA에는 매우 중요한 규칙이 있습니다.
체크리스트를 완료하지 않고는 절대 미션을 시작하지 않는다.

1단계 장비 점검 → 2단계 시스템 점검 → 3단계 승무원 점검 → 4단계 발사 준비

훈련 중 3단계에서 문제가 발생합니다. "문제 감지!"

크루는 즉시 멈추고, 관제센터에 보고하고, 문제를 해결하고, 3단계부터 재개합니다.

체크리스트는 단순한 루틴이 아닙니다. 그것은 안전 시스템입니다.

📝 Key Words
procedure
절차
nominal
정상 작동 상태
confirm
확인하다
status
상태
resume
재개하다
detect
감지하다
immediately
즉시
safety system
안전 시스템
❓ Check Questions
  1. What is NASA's most important rule about checklists?
  2. What does 'nominal' mean?
  3. What should the crew do when a problem is detected?
  4. Why is a checklist more than just a routine?
  5. What does the crew report when all steps are complete?
🗣️ Speak & Write
All systems nominal. Proceeding to Step 2.
Step 3 has a problem. Halting checklist.
Problem resolved. Resuming checklist from Step 3.
Checklist complete. All 4 steps done. Ready for launch!
✏️ Short Writing
A checklist is important because ____. | When a problem is detected, the crew must ____. | After the problem is fixed, trainees ____.
📖 Reading Passage — Grade 6

In space missions, one small mistake can become a very large problem.
That is why NASA uses detailed checklists for every stage of a mission.

Step 6 is Crew Procedure Training.
Trainees follow a four-step pre-launch checklist with precision and discipline.

Step 1 — Equipment Check: Every tool, suit, and gear must be verified and placed correctly.
Step 2 — Systems Check: All systems must report nominal. The crew does not proceed if even one system shows an anomaly.
Step 3 — Crew Check: Each crew member formally states their name, assigned role, and current status.
Step 4 — Launch Readiness: The commander reviews all steps and gives final confirmation.

During training, a problem is intentionally introduced at Step 3: "Oxygen flow: low. Sector 7-B."

The crew must halt, identify the problem, report clearly, execute corrective action, and request authorization to resume.

This training teaches a critical principle: procedures exist to prevent mistakes, not to slow things down.

우주 미션에서 작은 실수 하나가 매우 큰 문제로 이어질 수 있습니다.
그래서 NASA는 미션의 모든 단계마다 세부적인 체크리스트를 사용합니다.

6단계는 승무원 절차 훈련입니다.

1단계 장비 점검 → 2단계 시스템 점검 (이상 징후 시 진행 불가) → 3단계 승무원 점검 → 4단계 발사 준비

훈련 중 3단계에서 의도적으로 문제가 삽입됩니다.
"산소 흐름 낮음. 구역 7-B."

크루는 즉시 멈추고, 교정 조치를 실행하고, 재개 허가를 요청해야 합니다.

이 훈련이 가르치는 원칙: 절차는 실수를 막기 위해 존재하는 것이지, 속도를 늦추기 위한 것이 아닙니다.

📝 Key Words
precision
정확성
discipline
규율
verify
검증하다
anomaly
이상 징후
assigned role
배정된 역할
halt
즉시 멈추다
corrective action
교정 조치
authorization
허가
principle
원칙
❓ Check Questions
  1. Why does NASA use detailed checklists for every stage?
  2. What happens if a system shows an anomaly during Step 2?
  3. What does each crew member confirm during Step 3?
  4. What must the crew do when a problem is detected at Step 3?
  5. What is the critical principle this training teaches?
🗣️ Speak & Write
Step 3 — problem detected. Oxygen flow anomaly in Sector 7-B.
Halting checklist. Requesting Mission Control authorization.
Corrective action complete. Requesting authorization to resume.
All systems nominal. All steps complete. Ready for launch.
✏️ Short Writing
NASA uses checklists because ____. | When a problem is detected, the crew must ____. | A crew that follows procedures carefully is ____.
▸ 핵심 문장
"A checklist is not just a routine. It is a safety system."
체크리스트는 단순한 루틴이 아닙니다. 그것은 안전 시스템입니다.